Remedial
wall tie for use with thin wall far leaves and in buildings over
four storeys high.
Applications Where far leaf is a thin wall hollow block unable to provide a sufficient depth of grip, CemenTie uses a grout filled sock sleeve to provide a secure bond: grouted in both leaves, particularly from the fourth floor upwards to comply with fire regulations.
Features
one-piece grade 304 or 316
stainless steel tie
rotational flexibility accommodates
normal building movement
able to bond with thin wall
far leaf
easily proof tested for security
of fixing in far leaf
effective in all common building
materials
tie, sock sleeve and grout
create excellent bond
Benefits:
highly economical and effective
leaves building virtually
unmarked
minimal inconvenience to occupants
multiple drip points prevent
transfer of water across cavity