(A) Addition of new party wall.
The tie is usually installed at an angle into the existing
wall and
bent to lay along the mortar bed of the new wall.
One end of the tie can be sleeved to create a movement joint.
|
(B) Extension of existing wall.
Ties are installed horizontally into either the mortar
beds or
brickwork of the existing wall and bedded into the mortar
on
the new wall. |